From the trench to the top coat.
One contractor, one crew culture, thirteen ways to put it to work. Every line below is self-performed — the same standards from the dirt up.

Asphalt Paving
A pavement is a system — subgrade, base, binder, surface. We build all four, which is why ours last. Quality materials, machine-laid,…

Grading & Excavation
Everything above the dirt depends on what happens below it. Cut, fill, and compaction done exactly to grade — building pads, roadways,…

Asphalt Repair
A failing patch is money spent twice. We cut failures out square, fix the base problem underneath, and put back hot mix that bonds —…

Seal Coating
Asphalt ages from the top down — sun and water do the damage. A seal coat on schedule is the cheapest maintenance a pavement will ever get,…

Underground
The work you never see. We trench, bed, and lay pipe — storm drain, sewer, water — then backfill and compact so the surface above never…

Excavation
Foundations, roadways, ponds, and pads all start with dirt in the wrong place. We move it once, place it right, and leave a site that's…

Concrete
Curbs, gutters, sidewalks, pads, and approaches — formed straight, poured full, and finished to spec. Concrete is unforgiving, which is…

Concrete Pavers
Pavers live or die by what's under them. We build the base like a road — graded, compacted, edge-restrained — so the pattern you pick stays…

ADA Upgrades
Accessibility is code, liability, and the right thing to do — all three. We bring parking, ramps, and paths of travel up to current ADA…

Preventive Maintenance
The cheapest pavement is the one you already own. Crack fill, seal coats, and small repairs on a schedule cost a fraction of reconstruction…

Demolition
Old slab, dead pavement, whatever's in the way — sawcut square, broken, loaded, and hauled. Material recycled where it can be, and the site…

Retaining Walls
On this coast, ground moves — a wall either holds it or it doesn't. Footing, drainage, and compacted backfill are what make the difference;…

Tennis Courts
A court is a precision slab with a game on top. We repair the cracks, restore planarity, and rebuild the surface so it drains, plays true,…
Ready when you are.
Call, or send the job through the estimate form — Santana answers, seven days a week.